The main grassing step is now complete. To me, that is always the turning point for a layout - where it finally starts to change from a messy construction site to a real place. The station buildings and platforms have had a bit of detailing work, but have not yet been properly installed. Work on the backscene has also started, but I had to lower it slightly so the clouds are too low and will need to be repainted. Comments are closed.
|
Overview
British and Australian model railway layouts in T, N and OO. My Layouts
Friends' Layouts
Main Articles
Categories
All
Archives
April 2024
AuthorMartin Kaselis |
- Home
- My Linear Motor Layouts
- My Conventional Layouts
- Other Layouts
- T Gauge
-
Electronic Tips
- Blue Pill - Bare Metal C Programming
- Working Roads
- Hybrid DC - DCC Controller
- Using LEDs
- Connectors
- Controlling the Fleischmann Turntable
- Constant Brightness Tail Lamps (OO scale)
- Point Motors and Relays
- Point Motors and Toggle Switches
- Dapol Signals
- Colour Light Signals and Automation
- Synchronized Fast Clocks
- Wire Sizes and Voltage Drop
- DC Controllers
- Controller Types
- Feedback Controllers
- Working Level Crossing
- General Tips
- 3D Printing
- Contact
- Links