The layout has finally reached the pieces-coming-together stage, with the plastering, puttying and preliminary painting now done. Next come the platforms and paving.
All the buildings, railway and non-, have now been built. The platforms, and the foundations for the ground, roads and dummy tracks are taking shape. It is finally starting to look like a full model.
|
Overview
British and Australian model railway layouts in T, N and OO. My Layouts
Friends' Layouts
Main Articles
Categories
All
Archives
April 2024
AuthorMartin Kaselis |
- Home
- My Linear Motor Layouts
- My Conventional Layouts
- Other Layouts
- T Gauge
-
Electronic Tips
- Blue Pill - Bare Metal C Programming
- Working Roads
- Hybrid DC - DCC Controller
- Using LEDs
- Connectors
- Controlling the Fleischmann Turntable
- Constant Brightness Tail Lamps (OO scale)
- Point Motors and Relays
- Point Motors and Toggle Switches
- Dapol Signals
- Colour Light Signals and Automation
- Synchronized Fast Clocks
- Wire Sizes and Voltage Drop
- DC Controllers
- Controller Types
- Feedback Controllers
- Working Level Crossing
- General Tips
- 3D Printing
- Contact
- Links